Wastewater Reticulation Improvements at Lowell Place

  • Client
  • Consultant
  • Value
  • Taupo District Council
  • AWT (NZ) Ltd
  • $1,037,000


Project Scope: This project involved undertaking modifications to the existing wastewater reticulation system, in areas of particular concern including relocation of services away from the Taupo Lakes Foreshore protection zone using Climatherm heat resistant PE pipe and fittings.

The scope of construction works involved in the contract included:

  • Construction of a new 8 meter deep wastewater pumping station with additional storage capacity in Lowell Place.
  • Installation of new twin rising mains across SH1 and SH5 connecting in to the existing wastewater network.
  • Conversion of existing Pump Stations into emergency storage tanks
  • Modification of gravity sewers by slip lining where relocation was not feasible.
  • Construction of new sections of gravity reticulation outside the foreshore protection zone through both directional drilling and open cut methods
  • All earthworks, roading, pump/mechanical installations etc.

The contract was particularly challenging as a substantial portion of the contract was hot work, working in geothermal water zones with temperatures up to 80 C.

Click here to return to the previous page.

Make an enquiry

If there is a particular project you have in mind, or if you wish to ask us a general question then, click here.

Spartan Construction overview

Our overview proviced a more in depth view of Spartan Construction as a leader in construction.

Health & Safety

Spartan Construction has a culture that considers Health & Safety, Quality, and Environmental issues a high priority.