Wairere Power Station G5 Civil Works Upgrade

Client
King Country Energy
Consultant
PB Power (NZ) Ltd
Value
$0.6M

Project Scope

The Civil scope of the works for this project included:

  •   Removal of two existing obsolete turbines and associated draft turbines etc
  •   Building strengthening including pile installation of new turbine reinforced concrete foundation works
  •   Installation of a new draft tube, turbine, MIV (main inlet valve) and generator
  •   Lowering of the existing tailrace by 0.5m
  •   Construction of a new penstock foundation block and plinths; and installation of the penstock