Bridge 145 Improvements & Retaining Wall Construction Waikeria Road

Client
Otorohanga District Council
Consultant
WSP Opus
Value
$1.5M

Project Scope:

This contract is to construct a new bridge adjacent to an existing one-way bridge.

 

Major works included:

  • Installation of bottom driven piles
  • Construction of bridge abutments
  • Installation of client supplied "Super Tees"
  • Construction of bridge decking

Included is the supply of materials and construction of a new steel H-Beam and reinforced concrete slab retaining wall located adjacent to the existing bridge.

Also included is to take possession of 355mm OD sewer rising main pipe supplied by the Principal, arrange for transport and delivery to site, and for the supply of all other materials and construction of the sewer rising main.

 

More photos to follow soon.

 

This project is due for completion in August 2018.