Genesis Power Limited
CLIENT:
2009
YEAR:
Civil works for this project included:
Constructing and maintaining silt control structures, as required. I
Clearing and stripping of areas to be earthworked, including stockpiling of topsoil on site for reuse;
Supply and placing of all required stormwater pipework and associated fittings and connections.
Construction works associated with the west and south grit traps, including bulk earthworks,
demolition and off site cartage as necessary, foundation preparations, base and walls and inlet
and outlet structures.
Trenching and backfilling of cable trenches
Providing as-built survey information to the Engineer