Construction and commissioning of a raw water pipeline to feed raw water to a proposed 40 mega litre per day (MLD) membrane process plant.
This contract was for the construction and commissioning of a raw water pipeline to feed raw water to a proposed 40 mega litre per day (MLD) membrane process plant at the Waiora Water Treatment Plant
Key objectives of the work involved:
• Reconfiguration of the LLPS pipework to enable raw water to be pumped to the existing process, or the new process as required
• Installation of a new rising main to convey flow to the new process
• Minimization of disruption to the existing plant operations throughout the works