This contract was for the upgrade of the intake pump station, which will be required to

achieve a peak flow figure of 18.2 MLD or 211 l/s. The upgraded intake pump station will

continue to draw in water from the Waikato River and pump it 6km away to the upgraded

Parallel Road Water Treatment Plant.

The works include:

  • replacement of pumps and pipework within the dry well

  • replacement of

Critical to this upgrade will be maintaining full functionality of the existing facility at all times

throughout both the installation and the commissioning phases.