Major works included:

  • Installation of bottom driven piles

  • Construction of bridge abutments

  • Installation of client supplied "Super Tees"

  • Construction of bridge decking


Included is the supply of materials and construction of a new steel H-Beam and reinforced concrete slab retaining wall located adjacent to the existing bridge.


Also included is to take possession of 355mm OD sewer rising main pipe supplied by the Principal, arrange for transport and delivery to site, and for the supply of all other materials and construction of the sewer rising main.

This project was completed October 2018.