The locations are as follows:
Huntly 3.2ML 29m Diameter
Hopuhopu 1.15ML 16m Diameter
Pokeno 2.4ML 25m Diameter
Central Districts 3.0ML 28m Diameter
Works included:
Geotechnical investigation and ground improvements including 2m undercuts and preloading;
Site pipework including valve chambers;
Connections to the existing network;
Roading and access;
Construction of new booster pump station building including supply and installation of pumps and pipework;
Electrical installation;
Instrumentation and controls;
Testing, disinfection and commission of all tanks.