CLIENT:

YEAR:

The locations are as follows:

  • Huntly 3.2ML 29m Diameter

  • Hopuhopu 1.15ML 16m Diameter

  • Pokeno 2.4ML 25m Diameter

  • Central Districts 3.0ML 28m Diameter


Works included:

  • Geotechnical investigation and ground improvements including 2m undercuts and preloading;

  • Site pipework including valve chambers;

  • Connections to the existing network;

  • Roading and access;

  • Construction of new booster pump station building including supply and installation of pumps and pipework;

  • Electrical installation;

  • Instrumentation and controls;

  • Testing, disinfection and commission of all tanks.