CLIENT:
YEAR:
A SBR Process was adopted for this project which included construction of:
Inlet works including screening
SBR treatment tanks (including aeration, mixers and decanting)
PE Lined decant and emergency ponds
Sludge dewatering process
Chemical dosing
Land disposal field
Electrical and control design
Utilities building with Blower room and MCC room
Associated site works and consent compliance requirements.
The plant was successfully commissioned in May 2012 at the completion of the Design/Build phase and was operated and maintained by Spartan using Rotorua District Council operators.
Innovation
Innovations include using natural lay of the land to seal hydraulic flow, thereby minimising earthworks and including some over design to allow for future expansion from current loads of 425m3 to 835m3.