CLIENT:
YEAR:
The civil and structural works involved:
18,000m3 of earthworks to form effluent ponds.
Construction of two new reinforced concrete post tensioned tanks, one of which was 9m tall.
The design / build of a new reinforced concrete control building.
Construction of numerous pump stations, chambers and pipelines around the site.
M&E works required involved the installation of specialist mechanical equipment such as:
A gas mixing system
Two inlet screens
Trickling filter arms and media
Compressed air system
Numerous pumps and controls
Innovation:
Extensive use of precast elements to replace insitu structures.
Contractors design / build of the digester tank and the new control building.