CLIENT:

YEAR:

The civil and structural works involved:

  • 18,000m3 of earthworks to form effluent ponds.

  • Construction of two new reinforced concrete post tensioned tanks, one of which was 9m tall.

  • The design / build of a new reinforced concrete control building.

  • Construction of numerous pump stations, chambers and pipelines around the site.


M&E works required involved the installation of specialist mechanical equipment such as:

  • A gas mixing system

  • Two inlet screens

  • Trickling filter arms and media

  • Compressed air system

  • Numerous pumps and controls


Innovation:

  • Extensive use of precast elements to replace insitu structures.

  • Contractors design / build of the digester tank and the new control building.