top of page

CLIENT:

YEAR:

The proposed new treatment process included the design and construction of::

  • Polymer dosing systems

  • Sludge blending tank

  • Sludge Thickening system

  • New concrete storage tank

  • Heat exchangers

  • Boiler

  • Mesophilic concrete digester

  • Gas flare and gas storage system

  • Centrifuge

  • Design checking and certification procedures

  • Electrical and Control systems

Project Gallery

bottom of page